| Connecticut River Bridge Replacement |
A new, state-of-the-art Connecticut River Bridge is being built to improve train speeds, reliability, and safety, while also benefiting marine traffic. |
Enhancing the reliability, safety, and functionality of the new moveable span, addressing conflicts with rail and maritime conditions, and increasing train speeds, reducing travel times and improving overall efficiency. |
None |
| Darien Station Platform |
The platforms at the station will be completely replaced with new, heated panels to improve safety and accessibility for passengers with disabilities. |
Prioritizing economic development, safety, reliability, and resilience for the benefit of local communities |
Darien |
| Safety and Track Improvement Project |
New safety features are being installed at crossings, and maintenance of existing ones is ongoing. |
Maintaining rail lines and grade crossings in optimal condition, ensuring a safe and reliable journey for all passengers |
Springfield, Windsor Locks, Windsor |
| Walk Bridge Replacement |
The Walk Bridge, a vital connection for the Northeast Corridor, is being replaced with a new bridge that will improve safety, reliability, and travel times. |
Upgrading railroad infrastructure to reduce roadway congestion and improve travel times to and from New York City, making it easier for travelers to get around |
South Norwalk and East Norwalk |
| Windsor Locks Station |
The Windsor Locks Station will be replaced with a new station featuring high-level platforms, new lighting fixtures, and ADA accessible features. |
Replacing the existing Windsor Locks Station with an updated facility featuring high-level platforms, improved lighting, and ADA accessibility, making it easier and more inviting for passengers |
Windsor Locks |